Navigating Disruptions

The Fragility of Construction Supply Chains

In the wake of Baltimore's Key Bridge collapse, the importance of sea shipments in global supply chains becomes even more apparent. This recent incident, along with disruptions such as the Suez Canal blockage and constraints along the Panama Canal, highlights the fragility of supply networks vital to the construction industry. When disruptions occur, not only do shipping costs escalate, but longer ship routes result in delivery delays. Moreover, prolonged routes exacerbate shipping shortages, as vessels are either stranded or diverted onto longer journeys. Unlike other modes of transportation, the shipping industry doesn't have the luxury of idle vessels waiting to be deployed. Consequently, the repercussions of such disruptions reverberate far beyond the immediate vicinity of the incident, affecting industries reliant on just-in-time deliveries.

This vulnerability is especially pronounced in construction, where the timely delivery of building equipment is essential for project timelines and cost management. Material supply routes, acting as the industry's backbone, ensure a steady flow of resources, from basic elements like concrete and steel to specialized components like glass panels or intricate machinery. Any disruption in these routes can grind construction to a halt, causing costly setbacks and delays.

The ripple effects of disruptions, such as the Key Bridge collapse, resonate throughout the supply chain, with added costs and delays inevitably trickling down. Efficient material supply routes are crucial for cost management, as transportation expenses often constitute a significant portion of project budgets. By optimizing supply chains, minimizing transportation distances, and negotiating favorable contracts, construction firms can reduce costs and enhance their competitive edge.

The Key Bridge collapse underscores ongoing challenges compounded by the COVID-19 pandemic, particularly evident in the realm of supply chain management. The prevalent shift towards "just-in-time" manufacturing practices has inflated warehousing costs, impacting the logistics landscape. Despite the resultant increase in local material expenses for projects, this trend also promises enhanced project timeliness. In the construction industry where project time-lines are a critical strategic consideration, streamlining supply chains becomes imperative. While larger corporations may possess the resources to weather disruptions, smaller enterprises often lack the necessary buffers. Whether it's essential materials like concrete and steel or specialized components such as air control valves for HVAC systems, any hiccup in the supply chain can precipitate delays and budgetary overruns.

Amidst the delivery delay of the COVID-19 pandemic aftermath, Airstaus emerged to address a gap in the supply of air control valves for North America's construction industry. Recognizing the need for a resilient sourcing approach, Airstaus brought production of air valves locally,  manufacturing in Ontario, Canada. This strategic move shortened delivery times, reduced reliance on long-haul routes, and bolstered the resilience of its supply chain, of a product that was especially important at the time when building environment control was at the forefront of construction projects.

As construction adapts to a rapidly evolving global landscape, the ability to source building equipment from local or centrally located suppliers is extremely important in mitigating supply chain disruptions. By learning from recent events and embracing innovative solutions, the construction industry can navigate uncertainty and emerge stronger and more resilient.


Harnessing Clean Energy Advantage
Why Building Equipment Manufactured in Ontario Holds the Sustainability Edge