Se rendre au contenu
AirGenuity Work Instructions

AirGenuity Work Instructions

Work Instructions associated with AirGenuity Process

Responsable Allen Hess
Dernière mise à jour 2025-10-28
Temps d'achèvement 15 heures 50 minutes
Membres 6
Work Instructions Basique
3.4.4 Release of Aircuity Material
3.4.4 Release of Aircuity Material

WI that describes how to schedule release of Aircuity materials with the factory in the MyAircuity.com tool.

3.0 Project Execution
Voir tout
3.4.4 Release of Aircuity Material
3.4.4 Release of Aircuity Material
Aperçu

WI that describes how to schedule release of Aircuity materials with the factory in the MyAircuity.com tool.

Create WI with Design Checklist
Create WI with Design Checklist
Aperçu

Need a checklist for all documents to be included in shop drawings

3.4 Site Mobilization
3.4 Pre-Install Inspection
3.6 Customer Acceptance
3.5 Systems Start Up
3.6 Systems Integration
3.6 System Commissioning