AirGenuity Work Instructions
Work Instructions associated with AirGenuity Process
| Responsable | Allen Hess |
|---|---|
| Dernière mise à jour | 2025-10-28 |
| Temps d'achèvement | 15 heures 50 minutes |
| Membres | 6 |
Work Instructions
Basique
2.4 Service Sales Proposal Creation Work Instruction
2.0 Sales
Voir tout
2.4 Service Sales Proposal Creation Work Instruction
01:15
0
0
3.0 Project Execution
Voir tout
3.4.4 Release of Aircuity Material
Aperçu
WI that describes how to schedule release of Aircuity materials with the factory in the MyAircuity.com tool.
00:35
0
0
Create WI with Design Checklist
Aperçu
Need a checklist for all documents to be included in shop drawings
00:00
0
0